How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點擊重新得到驗證碼
主站蜘蛛池模板: 黑人巨大av在线播放无码| 热思思99re久久精品国产首页 | 在线亚洲精品国产一区麻豆| 国产亚洲一区二区手机在线观看| 亚洲中文字幕av无码区| 亚洲精品tv久久久久久久久j| 日本韩国的免费观看视频| 久久国内精品自在自线波多野结氏| 97影院理论午夜伦不卡| 国产在线乱码一区二三区 | 国产精品欧美成人片| 亚洲精品综合一区二区三| 国产成人92精品午夜福利| 亚洲不卡av一区二区三区| 2020年无码国产精品高清免费 | 中文在线а√在线| 粉嫩大学生无套内射无码卡视频| 99无码| 亚洲精品无码mv在线观看网站| 日本韩国的免费观看视频| 在线岛国片免费无码av| 国产亚洲精品在av| 亚洲愉拍二区一区三区| 亚洲色无码一区二区三区| 无码国产成人午夜电影观看| 亚洲伊人情人综合网站| 亚洲精品综合欧美一区二区| 男人和女人高潮做爰视频| 国产亚洲精品电影网站在线观看| 无码人妻久久一区二区三区免费| 欧美中日韩免费观看网站| 欧美高潮喷水大叫| 免费无码的av片在线观看| 日本午夜免a费看大片中文4| 亚洲日韩亚洲另类| 国产欧美亚洲精品第1页青草| 成人国产精品??电影| 久久国产精品久久喷水| 国产成人无码免费视频79| 国产亚洲999精品aa片在线爽| 图片区小说区另类春色|